PROCESS

PREFABRICATION REVIEW - SOUTHERN COURTYARD DEVELOPMENT : ADELAIDE CENTRAL SCHOOL OF ART, GLENSIDE

HIGH CUBE SHIPPING CONTAINERS READY FOR AUGEMENTATION AND PREFAB FITOUT.

CONTAINER SIDES CUT FOR LARGE SCALE SLIDING DOORS WITH NEW WALL BRACING FITTED

INTERNAL OF CONTAINERS WITH RAISED FLOOR AND INSULATED PANELS IN PLACE PRIOR TO PLYWOOD LININGS INSTALLED.

PAINTED CONTAINERS WITH ADDITIONAL NEW ROLLER ACCESS DOOR AND ELECTRICAL / LIGHTING FITMENTS READY FOR DELIVERY.

SHIPPING CONTAINERS CRANED INTO PLACE PRIOR TO BEING FIXED TO FOOTINGS ON SITE

MAIN CANOPY COLUMN FOOTING AND THREADED BOLTS PRIOR TO COLUMN AND BASEPLATE CONNECTION

MAIN CANOPY CLOUMNS IN PLACE, ROOF BEAMS CRANED INTO PLACE WITH HERITAGE FACADE BEYOND

STEEL PORTAL FRAMES AND LONG SPAN ARAMAX ROOF SHEETING

R12 FINISH CONCRETE SLAB POURED BETWEEN CONTAINERS FOR EXTERNAL TEACHING SPACE

FINAL TEACHING SPACE AS VIEWED FROM ABOVE

Skein